For more information contact: Water Division, 269-966-3506
Water valve replacement continues Friday
BATTLE CREEK, Mich. — City crews will continue replacing broken water valves, which will require temporary water shutoffs and a road closure beginning Friday, Aug. 26.
This work will require temporary water shutoffs from 10 p.m., Aug. 26, to 6:00 a.m., Aug. 27, in the areas listed below:
Capital Avenue S.W., between Washington Avenue and Fountain Street
Harrison Street, between Burnham Street E. and Whittier Ave
Cleveland Street, between Goguac Street E. and Rittenhouse Avenue E.
Riverside Drive, between Goguac Street E. and Rittenhouse Avenue E.
Janoah Street, between Harrison Street and Capital Avenue S.W.
Tennyson Avenue, between Harrison Street and Capital Avenue S.W.
Goguac Street E., between Capital Avenue S.W. and Riverside Drive
Baker Court, between Cleveland Street and dead end
Bluff Street, between Cleveland Street and Riverside Drive
Rittenhouse Avenue E., between Capital Avenue S.W. and Riverside Drive
Fountain Street W., between Caroline Street and Capital Avenue S.W.
City neighbors in this area should be prepared to be without water and for a potential boil water advisory when service returns. Additional information will be made available to the media, and through the city’s website and social media, should it become necessary.
Door hangers will be distributed to the homes affected.
During this work, Capital Avenue S.W., between Burnham Street E. and Dickman Road, will be closed and emergency vehicles will not have access from Aug. 26 at 9 p.m. through Aug. 27 at 6:30 p.m. A detour will be in place. A map of the detour is attached to this release.
Motorist are advised to avoid this area and follow all posted detour signs.
Due to this road closure, Transit route 4S, SW Capital bus, will detour on Saturday, Aug. 27.
Heading outbound the 4S bus will travel down Washington Avenue and turn right on Capital Avenue to resume regular route. During this detour the following bus stops located on SW Capital will not be serviced.
Outbound
Dickman Road near (old) K-Mart parking lot
Nina's stop
Battle Creek Avenue
Goguac Street
Webber Street
Janoah Avenue
Passengers who normally use these stops should plan to use the bus stop(s) located at the Transfer Center or on Capital SW near Washington Avenue.
Heading inbound the 4S bus will turn left on Washington Avenue and right on Hamblin Avenue heading towards the Transfer Center. During this detour the following bus stops located on SW Capital will not be serviced.
Inbound
Burnham Street
Janoah Avenue
Whittier Avenue
Goguac Street
Elder Street
Horrocks
Passengers who normally use these stops should plan to use the bus stop(s) located at Phelps Avenue or the Transportation Center.
If you need help planning your trip, please call Battle Creek Transit Dispatch at 269-966-3474.
The regular route will resume once the road is back open.
We appreciate everyone’s patience during this work.
See these streets on our Public Works interactive project map, by clicking this link DPW Construction Projects (arcgis.com). This is also available through the Your Government tab, under Public Works.
Original source can be found here.