Quantcast

Battle Creek Times

Tuesday, December 24, 2024

Power line work to cause temporary Battle Creek Linear Path closures, detours through April

A

closures, detours through April | Free CCO Credit

closures, detours through April | Free CCO Credit

BATTLE CREEK, Mich. — City contractors will be working on overhead power lines along Battle Creek Linear Path, resulting in temporary closures and detours of two sections of the path, from now through early April.

The specific Battle Creek Linear Path closures and detours are as follows:

Closure: Battle Creek Linear Path along Wagner Drive, near the intersection of Wagner and Union Street S.

  • Detour: Neighbors headed southwest along this section of Battle Creek Linear Path should follow Wagner Drive to the intersection of Wagner and Union Street S., and take a left on Union. Then, head south down Union until returning to the path.
Closure: Battle Creek Linear Path along Wagner Drive, from the intersection at Wagner and Wren Street to the intersection of the path and E. Emmett Street

  • Detour: Neighbors headed northeast along this section of Battle Creek Linear Path, at the intersection of Wagner Drive and Wren Street, should cross over Wagner using the crosswalk and proceed down the west sidewalk along Wagner. Then, turn right down E. Emmett Street, at the intersection of Wagner and Emmett, and proceed until they are able to return to the north-bound path.
Original source can be found here.

ORGANIZATIONS IN THIS STORY

!RECEIVE ALERTS

The next time we write about any of these orgs, we’ll email you a link to the story. You may edit your settings or unsubscribe at any time.
Sign-up

DONATE

Help support the Metric Media Foundation's mission to restore community based news.
Donate

MORE NEWS